AUH3497 - P.O Cable laying & Asphalt cutting
TThe project composed of cable laying & Asphalt cutting for DU site AUH3497 in Abul Abiyad Police camp.
Scope of Work:
- Removal and reinstatement of Asphalt 2 layers with 60cm
- Remove and calculate of subbase including the relaying of existing material for the subbase
- Excavation for the 40-meter length of sand with .60 Cm width including installation of cable into UPVC Pipe