Expansion of Central Camps of ADNOC Drilling
The project composed of upgradation of ADDC Supply to 5 NDC camps located at ( Habshan / Bu hasa / Madinat Zayed / Traif / …..)
Scope of Work:
- Energization and upgradation of ADDC Power supply to all camps.
- Supply, installation, Testing & Commissioning of all the Electrical equipment and materials as per ADDC Specification.
- Complete Earthling System, Power Cables, Cables joints, and Termination Excavation Laying, sand bedding, cable tile/ warning tape/route marker and backfilling as per ADDC Specification.
- Supply and construction of the sub-station buildings as per ADDC Specification.